La nuova app di Alison è ora disponibile su iOS e Android! Scarica ora

Descrizione

PROJECT MANAGEMENT READING MATERIAL: PART 5

Case Study - Software development

For many years, buying a software application or system meant that almost all of the development was done from scratch. That is to say, each act of development was unique or bespoke, just like the engineering done in the early years of the industrial revolution.

Nowadays, less and less software is being developed in this way. Instead, software applications are available in shrink-wrapped boxes containing a CD-ROM or are downloadable from the internet. These are known as commercial, off-the-shelf software or COTS for short. The term product line is used to denote a set of related products that are sold by the same company. Software has also become a major component of mass-produced items, such as motor vehicles, televisions and mobile phones.

Click on the links below to download and read extra material on project management for software development. This material will open in a new tab/window beside this one.


5-1 Six Phases of Project Management

5-2 Waterfall versus Cyclical Project Management

5-3 Software Development Working Methods

5-4 Top 11 Causes for Delays in IT Projects

5-5 Roles within a Project

5-6 Sample Action-and-Decision List

5-7 Sample Issue Log

5-8 Sample Risk Log

5-9 Sample Meeting Report

5-10 Sample Project Plan


To return to the Module Listing page click here.

Back to ModulesBack to Resources