A systems survey is initiated when the organization’s IT strategic plan prescribes the development or when a user requests the development or modification of a new system.

The systems survey goals are as follows:

• Identify the nature and the extent of systems development by determining for each reported problem the problem’s existence and nature.

• Determine the scope of the problem.

• Propose a course of action that might solve the problem. Determine the feasibility of any proposed development.

• Is there a technically, economically, and operationally feasible solution to the problem?

• Devise a detailed plan for conducting the analysis step.

• Determine who will conduct the analysis, who will head the project team, what tasks are required, and what the development timetable is.

• Devise a summary plan for the entire development project.

There are three aspects of feasibility:

• Technical feasibility.

• Operational feasibility.

• Economic feasibility.

These risks, many of which are discovered during the feasibility study, include:

• Project size.

• Degree of definition.

• Experience with technology.

• Organizational readiness.

Obtaining agreement on the document’s contents is a key element in the development process because such agreement paves the way for cooperation as the project progresses.