La fase di implementazione: la preparazione fisica impianti

  • Study Reminders

    Set your study reminders

    We'll email you at these times to remind you to study

    You can set up to 7 reminders per week

    You're all set

    We'll email you at these times to remind you to study

    Monday

    -

    7am

    +

    Tuesday

    -

    7am

    +

    Wednesday

    -

    7am

    +

    Thursday

    -

    7am

    +

    Friday

    -

    7am

    +

    Saturday

    -

    7am

    +

    Sunday

    -

    7am

    +
  • Note di Apprendimento
  • Revisione degli argomenti
    Emmanuel G.
    SS
    Emmanuel G.

    The phase looks at the physical facilities that need to be installed. Or adjusting system to work at the right time and right place.

    SORIE T.
    SL
    SORIE T.

    ergonomic factors yes.must be looked at.

    SORIE T.
    SL
    SORIE T.

    Changes has alot to do in the system

    Samuel I.
    KE
    Samuel I.

    preparedness is stressed here.You must seriously analyse the state of your physical facilities and make the necessary adjustments to accommodate the new system.

    BabaJide Martins F.
    TR
    BabaJide Martins F.

    Understood.

    Alice B.
    GQ
    Alice B.

    Preparing the physical facilities too is a tough task, a thorough analysis has to be done to know where there is need for change, what has to be changed first and how it will be implemented, preparing the physical facilities may even include modifying the entire building if need be.

    Kenneth  M A.
    GH
    Kenneth M A.

    The next part of the implementation process is preparing the physical facilities. How important or large a step this is will depend upon the system in question. It may be as simple as clearing a desktop to accommodate a PC to removing doors to allow the entry of large equipment. In some specialist cases, it may even involve changes to such things as the air conditioning and/or filtering equipment, security access etc. Each system will need to be analysed to identify where changes to the physical environment will be required and how those changes will be implemented. It is also important to identify the importance of the physical changes to the system, and thus the order in which they need to be completed. For example, if computer hardware to be used in the system can only operate at ten to twenty degrees, and there is no air conditioning, obviously the air conditioning must be installed before the new hardware

    Myo Z.
    MM
    Myo Z.

    Yes, will need satellite campus or workplace is more facilities.

    Bisheswar B.
    IN
    Bisheswar B.

    It is also important to identify the importance of the physical changes to the system, and thus the order in which they need to be completed.

    Larry C.
    US
    Larry C.

    prepare the physical environment. Does it need a/c? If so, get it before installing equipment.