Sécurité et santé dans la Construction (élèves de niveau troisième Construction et Disciplines connexes) - Démolition | fr - 117 - 14763
Loading
Précédent Previous slide Next slide Suivant

Démolition

  • Study Reminders

    Set your study reminders

    We'll email you at these times to remind you to study

    You can set up to 7 reminders per week

    You're all set

    We'll email you at these times to remind you to study

    Monday

    -

    7am

    +

    Tuesday

    -

    7am

    +

    Wednesday

    -

    7am

    +

    Thursday

    -

    7am

    +

    Friday

    -

    7am

    +

    Saturday

    -

    7am

    +

    Sunday

    -

    7am

    +
  • Notes d'étude
  • Révisions du sujet
    Kulani Abner N.
    ZA
    Kulani Abner N.

    Demolition: Preparatory Operations ( a) C o ordinate utility and mechanical service modifications with FM Work Control in advance of work. (b) Pro vide public pedestrian protections such as barrier fences and sidewalk sheds in accordance with local building code; and coordinate vehicle traffic control with campus police, subject to MUTCD (2000). (c) I dentify potential hazardous material conditions at the site. When potential h azardous conditions are apparent or suspected, testing shall be performed and the hazard eliminated before demolition starts. Common hazardous material site c onditions include (but are not necessarily limited to); asbestos-containing building materials (ACBMs), lead-based paint (LBP), polychlorinated biphenyls (PCBs) in lamp ballasts, mercury in fluorescent lamps and thermostats, microbial amplification reservoirs (molds, fung animal droppings), recoverable refrigerants, caustics, corrosives, metals, and petroleum products

    Miller J.
    GH
    Miller J.

    DEMOLITION OF PLAT

Notification

You have received a new notification

Click here to view them all