  • aaa
    jooj hywrd Iraq Observations and research v ery important for achieving an approved project system
    2015-05-06 13:05:52

  • aaa
    Bisheswar Boro India The system must be made fully operational before implementation.
    2015-04-30 09:04:41

  • aaa
    sunday mbiam Nigeria The stage for this moment to do a "stopover" and to assess What have we done? How do we do? What have we learned from this experience? What can we strengthen?
    2015-04-22 15:04:30

  • aaa
    Uba Oguchi Christian Nigeria Once the system has been implemented, the final phase in the project will be the use and evaluation phase. In this phase, the system should be in full use to meet the objectives that were initially identified in the planning phase.
    2015-04-14 14:04:41

  • aaa
    Twagirayezu Jean Baptiste Rwanda Case study: Mira, Muse of the Spheres and Musicale Musak. CHAPTER FIFTEEN. The story so far: It is time to launch the new portal and customer database. Mira has planned, plotted, analysed, discussed and co-ordinated. It's time to view the efforts of all that hard work!
    2015-04-09 15:04:13

    • aaa
      Twagirayezu Jean Baptiste Rwanda When review is needed in the process
      2015-04-09 15:04:01
  • aaa
    Jahidul Islam Bangladesh What Is Controlling?
    2015-04-08 00:04:26

  • aaa
    Jahidul Islam Bangladesh After having the user acceptance of the new system developed, the implementation phase begins. Implementation is the stage of a project during which theory is turned into practice. The major steps involved in this phase are: Acquisition and Installation of Hardware and Software Conversion User Training Documentation he hardware and the relevant software required for running the system must be made fully operational before implementation. The conversion is also one of the most critical and expensive activities in the system development life cycle. The data from the old system needs to be converted to operate in the new format of the new system. The database needs to be setup with security and recovery procedures fully defined. During this phase, all the programs of the system are loaded onto the user’s computer. After loading the system, training of the user starts. Main topics of such type of training are: How to execute the package? How to enter the data? How to process the data (processing details)? How to take out the reports? After the users are trained about the computerized system, working has to shift from manual to computerized working. The process is called Changeover. The following strategies are followed for changeover of the system. Direct Changeover: This is the complete replacement of the old system by the new system. It is a risky approach and requires comprehensive system testing and training. Parallel run : In parallel run both the systems, i.e., computerized and manual, are executed simultaneously for certain defined period. The same data is processed by both the systems. This strategy is less risky but more expensive because of the following facts: Manual results can be compared with the results of the computerized system. The operational work is doubled. Failure of the computerised system at the early stage does not affect the working of the organization, because the manual system continues to work, as it used to do. (iii) Pilot run: In this type of run, the new system is run with the data from one or more of the previous periods for the whole or part of the system. The results are compared with the old
    2015-04-08 00:04:12

  • aaa
    Bandar Alalwi United States of America do you thank the SDLC it good ?
    2015-04-06 18:04:17

  • aaa
    Bandar Alalwi United States of America i thank we will use the SDLC .
    2015-04-06 18:04:45

  • aaa
    Caroline Omoro Kenya Cab the evaluation phase be done after every phase of SDLC in order to avoid further system interference?
    2015-04-06 09:04:22

  • aaa
    Caroline Omoro Kenya In the evaluation phase intense analysis is done to ascertain whether set goals have been met at the stipulated time.This is where to parallel running systems are implemented which will help identify and solve problems quickly without interference.
    2015-04-06 09:04:53

  • aaa
    JUSTICE YEBUAH Ghana time to evaluate all the hard work done
    2015-04-02 02:04:10

  • aaa
    Michael Johnson United Kingdom Assess, inspect and snag.
    2015-04-01 23:04:53

  • aaa
    Nelly Wanjiku Lengoiboni Kenya this topic has really helped
    2015-04-01 11:04:07

  • aaa
    Genaro Ceballos Panama The stage for this moment to do a "stopover" and to assess What have we done? How do we do? What have we learned from this experience? What can we strengthen?
    2015-03-31 21:03:21

  • aaa
    Adrian Carter United Kingdom Time to go live and see if all the hard work has been done.
    2015-03-31 13:03:23

  • aaa
    Theophilus Owusu Ghana Great Lesson
    2015-03-27 19:03:44

  • aaa
    Leatile Chilindi Botswana interesting.
    2015-03-27 14:03:31

  • aaa
    Samuel Kofi Odoi Ghana Before actually implementing the new system into operations, a test run of the system is done removing all the bugs, if any. It is an important phase of a successful system. After codifying the whole programs of the system, a test plan should be developed and run on a given set of test data. The output of the test run should match the expected results. Sometimes, system testing is considered as a part of implementation process. Using the test data following test run are carried out: Program test System test Program test : When the programs have been coded and compiled and brought to working conditions, they must be individually tested with the prepared test data. All verification and validation be checked and any undesirable happening must be noted and debugged (error corrected). System Test : After carrying out the program test for each of the programs of the system and errors removed, then system test is done. At this stage the test is done on actual data. The complete system is executed on the actual data. At each stage of the execution, the results or output of the system is analyzed. During the result analysis, it may be found that the outputs are not matching the expected output of the system. In such case, the errors in the particular programs are identified and are fixed and further tested for the expected output. All independent modules be brought together and all the interfaces to be tested between multiple modules, the whole set of software is tested to establish that all modules work together correctly as an application or system or package.
    2015-03-27 04:03:13

  • aaa
    CONFIDENCE Ekeh Nigeria this shows if the project delivered its benefits, met the objectives, operated within the scope and produced the deliverables on time.
    2015-03-24 11:03:21